As mentioned earlier in the year the final phase of the award winning “The Zone” development at Temple Meads is now making excellent progress. Long Engineering’s work packages have now been extended from structural steel, balconies, canopies and glass / stainless steel balustrades to include general metalwork items, street furniture and an extensive aluminium parapet...
Continue Reading
The visually stunning Monkscroft care home, Cheltenham is just having it’s final touches made before residents move in. Under contract from Leadbitter, Long Engineering has delivered on time and on budget a mixed package of works including structural steel, architectural steel staircases, atrium glazing, general metalworks and recreational areas. Project value to Long Engineering circa...
Continue Reading
Long Engineering announces the completion of the Merchants Quay project situated within Gloucester Docks, on behalf of Vinci Construction. The company undertook a wide range of work packages including the structural steel atrium (which is located between each 4 storey apartment block), associated staircases / balustrades, lift shaft, canopies and entrance gates. However, the most...
Continue Reading
After producing designs over an extended period of time, fabricating the structures and completing the erection, the Barratt Homes,Hanham Hall Eco Village project has been given the green light. Two properties have been completed and after rigorous testing they have exceeded all quality and performance expectations. Long Engineering have been awarded the full contract which...
Continue Reading
Client : Barratt Homes South West Architect : WGY Contractor : Barratt Homes Spectacular Start for Houndwood Development The impressive new Barratt’s development at Street, Somerset has got off to a flying start thanks in part to high quality structural steelwork and architectural features provided by Long Engineering. Many of the 200+ properties will have...
Continue Reading
Client : Bristol Schools Architect : Nicholas Hare Contractor : Skanska BRIGHT AND COLOURFUL CATHEDRAL CHOIR SCHOOL Whilst Long Engineering didn’t paint the wall at Cathedral Choir School they certainly supplied some interesting architectural features! Items designed, fabricated and installed included entrance canopy, stair balustrades, handrails and a stainless steel ” green wall ” for...
Continue Reading
Client :CCR Architect : AFM Limited Contractor : Carillion WATER’S EDGE LOCATION FOR RESIDENTIAL/OFFICE DEVELOPMENT Standing directly beside Bristol Bridge this stunning residential and commercial building has transformed this stretch of waterway. Amongst the many architectural features fabricated and installed by Long Engineering are these “single section” corner balconies which add real value to the...
Continue Reading
Client : South Gloucester Council Architect : SGC Contractor : Cowlin Construction NEW “LEADING EDGE DESIGN” PRIMARY SCHOOL FOR KINGSWOOD Tasked with providing architectural steelwork and gate access controls within a restrained budget, Long Engineering have once again design, fabricated and erected this project – on time and on budget. Being located within a mile...
Continue Reading
26
Jul
Client : Bristol Schools Architect : Walters & Cohen Contractor : Skanska Architectural Features Enhance New Cotham School Long Engineering have successfully fabricated and erected staircase balustrades and a feature “wood wall screen” running along the entire length of the new facility. The “wall” consists of 87 individually sized steel frames each approximately 3.9 metres...
Continue Reading
1 2 3 4 5 6