Redcliffe Point Bristol

Client : Cowlin Design & Build
Architect : Stride Treglown
Contractor : Cowlin Construction

This conversion and extension of an existing storage building meant that Long Engineering had to design and manufacture both new enhancements including a rolled beam roof and then match and extend existing features including stairwells and balustrades. The hipped roof finishes off 16 new two storey apartments and benefits from stylish features including exposed stainless steel fittings.

Visit cowlin.co.uk

About the author

Leave a Reply