Salvations Army Bristol

Client : Leadbitter
Architect : Prior Manton T P
Contractor : Leadbitter

The Salvation Army hostel extension project provided Long Engineering with a range of opportunities including powder coated staircases and handrails to the interior plus external ramps and walkways protected by way of hot dip galvanising.

About the author

Leave a Reply